
Project Overview
The project involved the design of selected roads in the Cape Coast Metropolis, Ghana in 2003. The project was undertaken by MDC Ltd. NKA was the traffic engineering Consultant to MDC
NKA’s Role
- Traffic data collection
- Traffic data analysis and forecast
- Feasibility study and prioritization of roads for design and construction
- Engineering design of the selected roads
Value Added
NKA ensured accurate data collection, analysis, and design



